Minutes of the August 8, 2018 A/GFTC Planning Committee meeting.
Publication Type: Meeting Minutes
A/GFTC Planning Committee meeting minutes – June 13, 2018
Meeting minutes of the June 13, 2018 Planning Committee, as reviewed by members in attendance.
A/GFTC Planning Committee meeting minutes – April 11, 2018
April 2018 Planning Committee meeting minutes
A/GFTC Policy Committee Minutes 2018-02
Minutes of the February 2018 Policy Committee meeting.
A/GFTC Planning Committee meeting minutes – January 2018
Meeting minutes from the January 2018 Planning Committee meeting.
A/GFTC Planning Committee meeting minutes – December 2017
Minutes of the December 2017 A/GFTC Planning Committee meeting.
A/GFTC Planning Committee Minutes – Wednesday, June 14, 2017
A/GFTC Planning Committee Minutes
Wednesday, June 14, 2017 10:00 AM
Crandall Public Library, Glens Falls
Attendees Representing
Stu Baker Town of Queensbury Community Development
Ed Bartholomew EDC of Warren County
Frank Bonafide NYSDOT Region 1
Dan Barusch Town of Lake George
Rob Cherry NYSDOT Region 1
Lorenzo DiStefano NYSDOT Region 1
Ed Doughney Warren County DPW
Douglas Frost Village of Lake George
Steve Godlewski Creighton Manning Engineering
Harry Gutheil Mayor, Village of South Glens Falls
Maiken Holmes Warren County DPW
Tom Johnson The Chazen Companies
Laura Oswald Washington County LDC
Laura Sanda McFarland Johnson
Mike Valentine Saratoga County Planning
Greg Wichser NYSDOT Region 1
Staff
Aaron Frankenfeld A/GFTC
Jack Mance A/GFTC
1. Welcome and Introductions ‐ Aaron called the meeting to order at 10:02.
2. Visitors Issues
3. Administrative Items
A. Personnel update (Aaron) ‐ As previously discussed, we have hired a GIS
Technician for the summer months. Chuck Gordon is a Queensbury resident
and a student at SUNY Plattsburgh currently working toward a minor in GIS.
He is tasked with ADA Transition Plan field data collection, traffic count
geocoding, and other projects as those emerge. Also, Monika Bulman will be
leaving us after 19 1/2 years; her last day will be July 7. Aaron will assume
the administrative tasks in the short‐term; staffing levels will be revisited in
the fall of this year.
B. Procurement Policy ‐ (Aaron) ‐ There is no progress to report on the
formulation of a procurement policy. A draft policy will be developed for
review at the August 9 Planning Committee meeting in advance of Policy
Committee consideration in October.
Adirondack / Glens Falls Transportation Council
11 South Street, Suite 203
Glens Falls, NY 12801
p: (518) 223 – 0086 f: (518) 223 – 0584
info@a
gftc.org www.agftc.org
4. Transit
A. GGFT Update ‐ none provided
B. Transit Asset Management Plan (Aaron) ‐ Transit agencies are required by
federal transportation law to develop Transit Asset Management plans help
attain and preserve state of good repair. Asset management performance
targets were requested by January of 2017, and FTA is looking for an
agreement between MPOs and transit operators for data sharing and
reporting by June 30, 2017. At present, there is no firm deadline other than
the October 2018 due date for the TAM plan. Until recently, it has been
unclear whether a small urban area operator like GGFT would be required to
join NYSDOT’s group plan for rural operators. This does not appear to be the
case; NYSDOT MO indicated in a conference call with NYSAMPO on 6/9 that
this would not be a requirement. Scott Sopczyk and I have discussed this; our
staffs will work towards satisfying the FTA requirements and engage the
committees as necessary.
C. Rural Mobility Analysis ‐ (Jack) ‐ Project is progressing, A public outreach
survey was developed and subjected to a readability analysis before it was
<011a015d0190019a018c015d010f01b5019a011e011a035800030074015a015d016f011e0003019a015a011e018c011e0003015a010201900003010f011e011e01760003016f015d0175015d019a011e011a00030128011e011e011a010f01020110016c00
030128018c017d01750003016f0102010f017d018c00030102Lnd business
development professionals, the overall response has been strong. Tabulated
results from approximately 230 completed surveys were received today. A
committee meeting is scheduled for June 29. The project contract expires at
the end of June, but staff will address that issue.
5. UPWP
A. <000401c0015d0102019a015d017d01760003005a017d0102011a000303720003005900680026005e00180003010201100110011e0190019000030190019a01b5011a01c7000303720003037e00040102018c017d0176037f0003037200110102018c019a01
7d0176000301020176011a0003003e017d015001b5015d011aLice has
<011a011e016f015d01c0011e018c011e011a000301020003011a018c01020128019a00030110017d01760110011e0189019a01b50102016f0003011a011e0190015d01500176000301020176011a0003011e0190019a015d01750102019a011e0003017d01
280003019a015a011e0003015d01750189018c017d01c0011eLment
concepts identified in its Aviation Road / QUFSD Access Operations Analysis.
<0064015a011e0003011a018c01020128019a0003015a010201900003010f011e011e017600030190011e0176019a0003019a017d0003019a015a011e00030064017d01c101760003005e01b50189011e018c01c0015d0190017d018c000301020176011a00
03010200030175011e011e019a015d017601500003015d0190L scheduled
<0128017d018c0003019a017d0175017d018c018c017d01c10003037e003a01b50176011e000303ed03f1037f00030128017d018c0003018c011e01c0015d011e01c10358000300040175017d017601500003019a015a011e00030176011e01c10003018c01
1e019001b5016f019a01900003015d01900003019a015a0102Lt
implementing the right turn lane concept would likely require new signal
poles.
B. <0064018c010201280128015d011000030012017d01b50176019a00030057018c017d0150018c01020175000303720003037e003a01020110016c037f0003037200030064015a011e00030189018c017d0169011e0110019a00030110017d0176019a018c01
020110019a0003015a010201900003010f011e011e01760003Lsigned with
The Traffic Group. The current plan is for completion of all 51 count locations
<01c1015d019a015a015d017600030102000301900189010201760003017d01280003019a01c1017d000301c1011e011e016c01900355000301c1015d019a015a0003010200030190019a0102018c019a0003011a0102019a011e0003019a017d0003010f01
1e0003011a011e019a011e018c0175015d0176011e011a0003Lbased upon a
review of maintenance and paving schedules. Rob Cherry asked for
clarification on the data to be collected; Jack replied that all 51 counts were
to be 72‐hour counts and include classification and speed data as well as
traffic volumes.
C.
Halfway Brook Trail ‐ (Aaron) ‐ The Request for Proposals for a project to
provide a conceptual design for a bicycle and pedestrian connection between
the Halfway Brook Trail and the Hudson Pointe Preserve in Queensbury
yielded 6 responses. Three firms were interviewed on May 3rd; the project
was awarded to the team of Alta Planning + Design and Creighton Manning
Engineering. The contract is signed as of today and the project will
commence shortly.
D. Warren County Bikeway Extension ‐ (Aaron) ‐ Jack and Aaron recently met
with the Town and Village of Lake George to discuss the potential scope of
<019a015a015d019000030189018c017d0169011e0110019a0358000300040190000301020003018c011e019001b5016f019a0003017d01280003019a015a0102019a0003011a015d0190011001b501900190015d017d0176035500030004036c0027002600
64001200030190019a010201280128000301c1015d016f016fL develop an RFP
for a project to identify and analyze a conceptual bicycle and pedestrian
connection between the terminus of the Warren County Bikeway in the
Village of Lake George and the hamlet of Warrensburg. Several on‐and off‐
road elements will be considered. That RFP will be issued sometime within
the next two weeks.
E. Website update ‐ (Jack) ‐ Staff has met twice with our website development
consultants, Infinity Graphics; first to discuss site architecture and then
design. The site will be modernized with primary goal of enhancing
document access. Rob Cherry asked if a comment feature would be included;
Aaron noted that the existing site already has one, but Jack in turn noted that
it does not have an upload utility. Staff will raise that issue with Infinity
Graphics staff.
F. Program request ‐ Town of Johnsburg entrance corridor ‐ (Aaron) ‐ This topic
was added to the agenda at the request of the Warren County Planning
Department. No representation from that department is present, and staff
<015a010201900003015d0176019001b501280128015d0110015d011e0176019a0003015d01760128017d018c01750102019a015d017d01760003019a017d0003016f011e0102011a0003019a015a0102019a0003011a015d0190011001b501900190015d01
7d0176035800030003L
G. Program request ‐ Village of Greenwich pedestrian access and parking ‐
(Aaron) ‐ As a follow‐up to the UPWP request from the Village of Greenwich
to identify parking improvements, Aaron met with Village officials on 5/26 to
discuss. The Village is interested in pursuing streetscaping and parking
improvements in its downtown area, as well as establishing a pedestrian
connection to a former industrial site along its waterfront. During that
discussion, it was noted that there are traffic restrictions expected as part of
the project to rehab or replace the railroad bridge over NYS 372; it was
suggested that this summer may not be the best time to attempt to quantify
parking demand. Aaron request from the Village a revised list of priorities to
better inform next steps, but elements of this effort will likely be delayed
until the next calendar year.
6. TIP
A. Project updates from local sponsors
Warren County DPW ‐ (Ed Doughney)
o Palisades Road over Brant Lake Inlet ‐ A recent public meeting was
well attended and generated numerous comments. Ongoing
<011a011e0190015d015001760003011e01280128017d018c019a0190000301c1015d016f016f00030102019a019a011e01750189019a0003019a017d0003016f015d0175015d019a0003018c015d0150015a019a0372017d0128037201c1010201c7000301
5d0175018901020110019a0190035800030003L
o <0012017d01b50176019a01c70003005a017d01b5019a011e000303f003f00003010f018c015d011a0150011e000301890102015d0176019a015d0176015000030189018c017d0169011e0110019a00030372000301020176019a015d0110015d0189010201
9a011e011a00030110017d01750189016f011e019a015d017dLn
in early July.
o County Route 13 and 31 painting project ‐ CR 31 to be completed
first, then CR 13 in August.
o County Bridges asbestos abatement and painting project ‐ design
approval sought for all three bridges, although two will be
painting projects and one will be a full replacement.
o West Brook Road sidewalk ‐ completed just before Americade
o West Mountain Road pavement preservation ‐ completed in May;
ready to schedule final walkthrough
o Bay Road pavement preservation ‐ underway; to be completed in
July
Saratoga County ‐ Mike Valentine reported that the Bluebird Road
pavement preservation project had been awarded. Lorenzo DiStefano
reported that the Town of Moreau pavement preservation projects were
<01b50176011a011e018c0003011a011e01c0011e016f017d01890175011e0176019a0003010f01c70003010200030176011e01c100030110017d0176019001b5016f019a01020176019a0003037e003e0102010f011e018c0150011e037f03550003010201
76011a00030057005e000301020176011a0003001c000301c1Lere
under review.
<0012015d019a01c70003017d012800030027016f011e01760190000300260102016f016f0190000303720003037e001c011a000300110102018c019a015a017d016f017d0175011e01c1037f0003037200030064015a011e00030026015d018c011e000300
5a017d0102011a00030189018c017d0169011e0110019a0003Lwas
underway. Completion is anticipated by the end of August. Tree‐cutting
had taken place in March so as not to threaten the Indiana bat. Related
<0190019a017d018c017501c10102019a011e018c000301c1017d018c016c0003015d01900003016f017d01100102016f015d01cc011e011a000301020176011a00030176017d019a000301020190000301c1015d011a011e01900189018c011e0102011a00
03010201900003015a0102011a0003010f011e011e01760003L
reported to the Post‐Star. Ed thanked Rob Cherry for his review and
<0110017d01750175011e0176019a01900003017d01760003019a015a011e0003001c01c6015d019a000303ee03ec0003005a002600570355000301c1015a015d0110015a0003015a010201900003010f011e011e017600030110015d018c011001b5016f01
02019a011e011a0003019a017d0003019a015a0102019a0003Lproject’s
<019a011e0110015a0176015d01100102016f00030110017d01750175015d019a019a011e011e00030175011e0175010f011e018c019000030128017d018c00030102011a011a015d019a015d017d01760102016f0003018c011e01c0015d011e01c1035800
03L
B. NYSDOT report ‐ (Frank Bonafide) ‐
A project is underway to replace the last of the deteriorated rustic rail
along Routes 8 and 9N.
Route 9N pavement repairs are largely completed.
Vendor‐placed paving projects are planned for Route 8 in Warren County
and Route 22 in Salem.
Repair to Baldwin Corners Bridge over the Champlain Canal are expected
to be completed by November 2017.
Region 1’s local project sponsors continue to perform well with regard to
the Regional Director’s project commitment list.
C. TIP Amendments ‐ none
7. Other Items of Interest ‐ Frank Bonafide reported that Tom Hoffman is the new
Regional Design Engineer. In an unrelated note, there will soon be vacancies at the
<015a011e0102011a0003017d01280003019a015a011e0003004b0189011e018c0102019a015d017d01760190035500030064018c010201280128015d0110000303980003005e01020128011e019a01c70355000301020176011a00030012017d0176019001
9a018c01b50110019a015d017d017600030150018c017d01b5Lps. Chris Ward will be
filling in for Mike Johnson in Operations, and Mark Pyskadlo will be filling in for Mark
Kennedy in Traffic & Safety. Frank also added that $50M has been added to the Bridge
<0045007a00030189018c017d0150018c0102017500030128017d018c000301020003012801b5019a01b5018c011e00030189018c017d0169011e0110019a00030190017d016f015d0110015d019a0102019a015d017d01760003037e011a0102019a011e00
03006400110018037f03580003005e017d0175011e0003017dLf that money will be
dedicated towards culverts. Local project sponsors are encouraged to develop
compelling narratives to accompany their condition assessments. Dan Barusch noted
that the Lake George Gateway Project was 99% complete. Mayor Gutheil asked if
anything was being done to advance the removal of the former Fenimore Bridge over
the Hudson River. Aaron offered to convey that question to Washington County DPW,
as the lead agency of the original project.
8. Next Meeting and Adjourn ‐ <0064015a011e00030176011e01c6019a00030175011e011e019a015d017601500003015d0190000301900110015a011e011a01b5016f011e011a00030128017d018c0003000401b5015001b50190019a000303f50355000303ee03ec03ed03f30003010201
9a0003L
10:00.
A motion was made to adjourn the meeting at 10:52.
Moved by: Laura Oswald Seconded by: Ed Doughney Meeting adjourned.
A/GFTC Planning Committee Minutes – Wednesday, March 8, 2017
Policy Committee Meeting Minutes
Wednesday, March 8, 2017 10:00 AM
Attendees Agency
A/GFTC Committee Members and Participants
Mitch Suprenant, Chair Supervisor, Town of Fort Edward
John Strough, Vice‐Chair Supervisor, Town of Queensbury
Sam Zhou, Secretary Regional Director, NYSDOT Region 1
Frank Bonafide RPPM, NYSDOT Region 1
Sarah Bowman CHA
Mike Breault Washington County DPW
Chris DeBolt Washington County Administrator
Kevin Geraghty Warren County Administrator
Steve Godlewski Creighton Manning Engineering
Wayne LaMothe Director, Warren County Planning Department
Dan Rourke Barton and Loguidice
Scott Sopczyk Greater Glens Falls Transit
Frank Thomas Supervisor, Town of Stony Creek
Mike Valentine Senior Planner, Saratoga County Planning
Greg Wichser NYSDOT Region 1
Staff
Aaron Frankenfeld A/GFTC
Jack Mance A/GFTC
1. Welcome and Introductions
2. Visitors Issues
3. Administrative Items
A. Committee roster for 2017 ‐ (Aaron) a printed copy of committee and staff members was
provided; new voting members of the Policy Committee for 2017 are Ed Kinowski, Chairman
of the Board of Supervisors in Saratoga County, and Ron Conover, Chairman of the Board of
Supervisors in Warren County.
B. Action item
‐ renaming of the Technical Advisory Committee to the Planning Committee
(Aaron)
staff proposes changing the name of the Technical Advisory Committee to the
Planning Committee;
hoping to generate more public involvement, and this convention is by far the more
common among NYS MPOs;
the draft UPWP for consideration today has been formatted as the change is
approved, as the TAC has reviewed an no comments were provided; and
Adirondack / Glens Falls Transportation Council
11 South Street, Suite 203
Glens Falls, NY 12801
p: (518) 223 – 0086 f: (518) 223 – 0584
info@agftc.org
www.agftc.org
a motion is needed to process change.
Moved by: Frank Thomas
Seconded by: John Strough Motion Carried
Wayne LaMothe reminded staff of his prior request to have a letter sent to the County Attorney’s office
as notification of this change.
4. Transit
A. GGFT Update (Scott Sopczyk) ‐ handout provided
Capital projects include purchase of one replacement operations vehicle and award
for purchase of three replacement trolleys.
Received 2017 FTA grant award, also to include hybrid vehicle replacement battery,
facility updates, and operations and preventative maintenance funding.
Specifications are being developed for the purchase of four replacement buses in
2019.
2016 ridership was 351,900, the second highest total in GGFT history (2015 was the
highest).
Staff expansion to include a new Deputy Director position to engage in new service
enhancements and developments is under consideration.
Scott also noted that a possible cap on guest workers may impact trolley ridership during the
summer season.
B. Action item
‐ revised MOU between A/GFTC and GGFT ‐ (Aaron)
GGFT has proposed a renewal to the MOU with A/GFTC to allow for shared staffing
support to advance transit‐related planning tasks;
new MOU would increase annual billing limit from GGFT to A/GFTC, set by annual
work program updates, to $20,000;
committee participation and reporting protocols are also reinforced ;
TAC has reviewed and approved this for Policy Committee consideration; staff
seeking motion to approve.
Moved by: Frank Bonafide
Seconded by: John Strough Motion Carried
C. Rural Mobility Analysis ‐ (Jack) ‐
Progress to date includes completion of an interim report highlighting
transportation service deficiencies, based upon interviews with transportation
providers and social service agencies.
A committee meeting is scheduled for this afternoon (3/8/17, 1:00 PM) to review
potential services that could help to address those deficiencies.
Chris DeBolt asked if the consideration of allowing Uber‐ and Lyft‐type operations in
New York would impact the options provided; Jack replied that some of the
proposed remedies were very similar to rural versions of those services.
Mike Valentine asked if municipal clerks had been contacted for feedback; Jack
replied that the focus was on contacting agencies that provide transportation
services.
5. Annual Work Program (UPWP)
A. Ongoing activities
1) Aviation Road / QUFSD Study
I. Presentation (Aaron)‐ One of our ongoing tasks is an access analysis from
Aviation Road to Queensbury Schools. The town has been experiencing
difficulties with the existing traffic signal at the main entrance to the school
campus, and the school district is working on its own capital improvement
plans. Barton and Loguidice was hired by A/GFTC at the Town’s request to
work with the Town and the school district to develop conceptual
improvements for school access to maximize safety and efficiency. Aaron
introduced Dan Rourke, Project Manager from Barton and Loguidice, who in
turn provided a presentation of the study. Dan reviewed existing traffic
conditions (including poor LOS and above‐average crash rates at select
intersections) and a number of suggested improvement alternatives. The
preferred conceptual improvement that emerged from the project steering
committee is a phased project that includes upgraded traffic signal
hardware at the existing entrance to the school, a westbound right‐turn
lane entering the campus from Aviation Road, and the construction of a new
four‐way intersection at Cottage Hill Road ‐ that would include a traffic
signal that would be coordinated with the improved signal at the main
driveway. Discussion ensued. Sam Zhou suggested that the project could be
a potential Highway Safety Improvement Program candidate, and that the
corridor may benefit from a more comprehensive analysis, including access
management strategies. Scott Sopczyk asked if the signals would be
actuated; Dan replied that that would be the preferred approach.
II. Next steps ‐ additional analysis ‐ (Aaron) ‐ Supervisor Strough has
requested additional technical analysis to provide information to the Town
on how short‐term repairs to the malfunctioning traffic signal would
integrate with longer ‐term improvements recommended in the report. B&L
has responded with a supplemental scope of work and fee that is
reasonable and addresses the Town’s concerns. Staff will direct B&L to
proceed.
III. Action item
‐ staff requests a motion to approve to the study as complete
before initiating the supplemental work.
Moved by: John Strough
Seconded by: Mike Valentine Motion Carried
2) Traffic Count RFP ‐ (Jack) ‐ An RFP was issued for consultant assistance for the
traffic count program discussed at the TAC and included in the upcoming UPWP.
No proposals were received. Feedback from a consulting firm suggested that the
maximum annual budget to conduct the program over a three‐year
implementation period was too low. A number of options are available; staff will
re‐issue the RFP after reconsideration of how to present the target cost.
3) Other staff and consultant activities ‐ (Aaron)
Staff has been working with our existing website host, Mannix Marketing,
to identify updates and upgrades to the A/GFTC website. A proposal is
under review.
A/GFTC has been providing staff assistance to the Warren County
Planning Department in its efforts to encourage municipalities to update
their ADA Transition Plans. A meeting was held with the Town and Village
of Lake George, and a meeting with the Town of Chester is scheduled for
March 20.
Staff is also coordinating with Warren County Planning to prepare a GIS‐
based substitute for the GGFT online route map viewer that has been
rendered inoperable by software updates at Google.
An initial meeting was held with the Town of Queensbury and Warren
County Safe and Quality Bicycling Organization to discuss the Halfway
Brook Connector, another upcoming A/GFTC UPWP project.
B. UPWP Update (2017‐2019) ‐(Aaron)
1) Review of accomplishments ‐ a handout listing the accomplishments from the
previous state fiscal year (SFY) was reviewed; one change from the list included in
the draft is that the Rural Mobility Analysis will continue into the next SFY rather
than be completed by then.
2) Program Summary ‐ A handout summarizing the proposed contents of the two‐
year work program was reviewed. During that review, the following items
generated additional discussion:
Following mention of the possibility of adding a GIS intern, Wayne
LaMothe suggested that consideration be given to sharing that staff with
Warren County Planning.
Wayne also suggested that the scope of the proposed Warren County
Bikeway extension project be expanded to include analysis of a
connection to Chestertown.
The draft program was reviewed by the Technical Advisory Committee and
approved for public comment; the public comment period closed on March 3rd
with no comments received.
3) Action item
‐ approval of 2017‐19 UPWP ‐ staff requests a motion to approve the
work program.
Moved by: Mike Valentine
Seconded by: Frank Thomas Motion Carried
6. Transportation Improvement Program
A. Capital Project Updates and Review (major developments and/or planned activities for
2017):
1) Warren County ‐ Aaron read from an update provided by Warren County DPW,
including anticipated construction completion dates for:
West Brook Road sidewalks (05/2017)
County Route 44 over the Hudson River bridge painting (07/2017)
CR 31 and CR 13 bridge painting (08/2017)
West Mountain Road pavement preservation (06/2017)
Bay Road pavement preservation (08/2017)
2) Washington County ‐ Mike Breault reported the following:
The Final Design Report for the CR 113 bridge replacement has been
delivered to NYSDOT.
CR 10 over the Poultney ‐ VTrans is the lead agency for documenting
potential adverse effects to NYSHPO.
Lower Turnpike / Center Falls bridge painting ‐ County is recommending
award to P.S. Bruckel; package was sent to GPI; pre‐construction
meeting to be scheduled soon.
CR 40 and 75 pavement preservation ‐ awaiting proposed fee and scope
of services from consultant.
3) Saratoga County ‐ Aaron reported that Saratoga County DPW is advancing the CR
27 pavement preservation project, and that a meeting was held with NYSDOT,
A/GFTC, and the Town of Moreau to progress the Reservoir Road and Feeder Dam
Road pavement preservation project.
4) City of Glens Falls ‐ Steve Godlewski reported that the City opened bids for the Fire
Road TAP project and that the project was expected to be awarded next week.
5) NYSDOT ‐ Frank Bonafide reported the following:
Local sponsors were thanked for their role in helping Region One’s State
and local project delivery performance.
The Route 9N spot‐repair project will be constructed this year.
Additional bridge and pavement preservation projects are targeted for
Washington County.
An announcement on the TAP /and CMAQ awards is expected soon,
possibly by the end of March.
A culvert project in Fort Ann was awarded as part of the Bridge NY
program. The program is expected to be ongoing, with four additional
rounds of $200M in projects to be solicited for on an every‐other‐year
cycle.
The Empire Trail program has been announced by the Governor’s office. This will be a
collaborative effort with NYSDOT and NYSPRHP to advance completion of statewide
bicycle trail. The anticipated alignment through the A/GFTC area would largely follow
State Bike Route 9. Alta Planning and Design is leading the planning effort. Aaron noted
that conditions along sections of Route 4 (a component of State Bike Route 9),
particularly between Fort Ann and Whitehall, do not allow for comfortable on‐road
bicycling operations and that opportunities exist, with adequate funding, to consider
off‐road portions along the Champlain Canal. Frank affirmed that A/GFTC would be
provided an opportunity for input during the planning process.
7. Other Items ‐ Chris DeBolt noted that Washington County was planning improvem
ents to its facility
parking areas and that inclusion of electric vehicle charging stations was under consideration. Chris
requested A/GFTC assistance to inform that consideration. The ensuing discussion yielded that
NYSERDA was actively soliciting for project candidates as part of a program to fund charging station
installations; Jack then offered to provide the County with a contact for NYSERDA.
Kevin Geraghty stated that it would be far more valuable for the State to be repaving roads like NYS
418 than constructing bike trails.
8. Next meeting and adjourn ‐ The next Policy Committee meeting is scheduled for October 11; the next
Planning Committee is April 12.
The meeting was adjourned at 11:40.
A/GFTC Planning Committee Minutes – Wednesday, December 14, 2016
A/GFTC TAC Minutes
Wednesday, December 14, 2016 10:00 AM
Crandall Public Library, Glens Falls
Attendees Representing
Brian Abare Village of South Glens Falls
Sarah Bowman CHA
Stu Baker Town of Queensbury Community Development
Ed Bartholomew EDC of Warren County
Dan Barusch Town of Lake George
Shannon Bush The Chazen Companies
Rob Cherry NYSDOT Region 1
Bryan Cross NYSDOT Region 1
Ed Doughney Warren County DPW
Steve Godlewski Creighton Manning Engineering
Maiken Holmes Warren County DPW
Karen Hulihan NYSDOT Region 1
Wayne LaMothe Warren County Planning
Dan Rourke Barton and Loguidice
Laura Sanda McFarland Johnson
Ed Snyder Greenman Pedersen, Inc.
Scott Sopczyk Greater Glens Falls Transit
Jeff Tennyson Warren County DPW
Mike Valentine Saratoga County Planning
Greg Wichser NYSDOT Region 1
Staff
Aaron Frankenfeld A/GFTC
Kate Mance A/GFTC
1. Welcome and Introductions
2. Visitors Issues
3. Administrative Items
A. Draft Meeting Calendar ‐ 2017 ‐ (Aaron) ‐ please review the attached draft
meeting schedule and notify us of any institutional conflicts; these are all 2nd
Wednesdays except for January 18
B. On‐call contracts ‐ (Aaron) ‐ contracts with CME, CHA and RSG expire at the
end of the year; A/GFTC has option to renew and will do so with CME and
CHA. We weren't able to find work for RSG; like to open that one up for
solicitation. No objections to this approach.
C. <00040018000400030064018c010201760190015d019a015d017d017600030057016f010201760003019a018c0102015d0176015d01760150000303720003037e00040102018c017d0176037f0003037200030026002c00740004000301c1015d016f016f00
03010f011e00030110017d0176011a01b50110019a015d0176Lg ADA
Transition Plan Training on January 9th here in this room from 9‐4:30. PDHs
Adirondack / Glens Falls Transportation Council
11 South Street, Suite 203
Glens Falls, NY 12801
p: (518) 223 – 0086 f: (518) 223 – 0584
info@a
gftc.org www.agftc.org
<01020176011a000300120044019000030102018c011e0003010201c00102015d016f0102010f016f011e0003019a017d00030102019a019a011e0176011a011e011e019003580003005e018901020110011e0003015d01900003010201c00102015d016f01
02010f016f011e035800030064018c010201760190015d019aLion Plan
<010201900190015d0190019a010201760110011e0003015d01900003010201c00102015d016f0102010f016f011e0003019a017d00030004036c00270026006400120003017501b50176015d0110015d01890102016f015d019a015d011e01900003019a01
5a018c017d01b50150015a0003019a015a011e000300680057LWP.
4. Transit
A. GGFT Update ‐ (Scott Sopczyk): GGFT recently ordered three replacement
trolleys, similar to the last two in that they are slightly larger than previous
vehicles; $26,000 was recently programmed towards facility improvements
with a ten‐year service life; despite system ridership being down
approximately 5.6% from last year, 2016 ridership was still the 2nd highest
on record and up from 2014.
B. Rural mobility analysis ‐ (Kate):
consultant team (led by Steadman Hill Consulting (SHC)) has
progressed stakeholder interviews
committee meeting was held in early December, as well as a targeted
stakeholder meeting with Washington County public agencies
primary limitations expressed were ride eligibility and passenger
capacity
SHC working to complete analysis matrix and interim report
<018901b5010f016f015d01100003017d01b5019a018c011e01020110015a0003010201890189018c017d01020110015a0003015a010201900003010f011e011e01760003018c011e01c0015d0190011e011a0003019a017d0003011e017601500102015001
1e0003019a015a011e0003018901b5010f016f015d01100003L
during the alternatives analysis
<0044015d016c011e000300730102016f011e0176019a015d0176011e000301020190016c011e011a0003015d012800030102017601c70003017d01b5019a018c011e01020110015a0003015a0102011a0003010f011e011e01760003011a015d018c011e01
10019a011e011a0003019a017d01c10102018c011a01900003Lagencies
in Moreau; Kate replied that the Moreau Community Center has been
contacted. Rob Cherry asked about the timing of the public outreach;
ensuing discussion concluded that engagement at either before or after
recommendations had advantages. The next committee meeting is
planned for either the end of January or early February.
C. Online Route Map ‐ (Aaron) GGFT recently informed us that the online route
viewer was not functioning properly. Spoke with the application vendor
(VHB); they determined that is was changes to Google software that
rendered the application obsolete. Staff has determined that it can be fixed
<01c1015d019a015a0003010201760003001c005e005a002f0372010f01020190011e011a0003019001b5010f0190019a015d019a01b5019a015d017d0176000301020176011a000301c1017d01b5016f011a00030189018c011e0128011e018c0003019a01
7d0003010f018c011e0102016c0003019a015a011e00030110Lycle of
<0110017d0176019001b5016f019a01020176019a0003011a011e0189011e0176011a011e0176011001c70003037e01020176011a0003016f015d0110011e01760190015d0176015000030128011e011e0190037f000301c1015d019a015a0003019a015a01
5d01900003010201890189016f015d01100102019a015d017dLn. Warren
County GIS will be assisting with the development of the replacement app;
should be ready by end of January.
5. UPWP
A. Aviation Road ‐ QUFSD access study ‐ (Aaron) ‐ Committee meeting was held
on 10/18; preferred alternatives were refined to include a new signal that
<0110017d01b5016f011a0003015d01760110017d018c0189017d018c0102019a011e000301020003018c015d0150015a019a0003019a01b5018c01760003016f01020176011e00030102019a0003019a015a011e0003011e01c6015d0190019a015d017601
50000301900110015a017d017d016f0003011e0176019a018cLance, eventual
<015d01760190019a0102016f016f0102019a015d017d01760003017d01280003019a015a0102019a0003018c015d0150015a019a0003019a01b5018c01760003016f01020176011e0355000301020176011a0003010200030176011e01c100030190015d01
5001760102016f015d01cc011e011a0003015d0176019a011eLrsection of
Cottage Hill Road and a school driveway. Total cost of all expe
cted to be
$500‐550k. CHA sent refined internal circulation renderings to Barton and
Loguidice at the end of November.; they expect to have a final draft to the
study group at the beginning of January.
B. Traffic Count Program ‐ (Kate) ‐ work has progressed on the GIS layer that
will be used to identify count locations; Scott Tracy at Washington County
DPW has spent time to review and has returned a number of good
<018c011e0110017d01750175011e0176011a0102019a015d017d0176019000030128017d018c0003018c011e01c0015d0190011e011a0003016f017d01100102019a015d017d0176019003560003007401020190015a015d01760150019a017d0176000300
12017d01b50176019a01c70003015a0102019000030102016fLso agreed
to collect GPS data for those locations. NYSDOT will be contacted for
feedback; targeting February for an RFP date. Preliminary analysis yields
approximately 300 count sites, mostly rural county roads, to be collected
over a three‐year cycle.
C. Update on other UPWP tasks ‐ (Aaron) ‐ annual pavement scoring results
have been transmitted to staff from CME. In 2016, over 90% of the local
federal aid eligible roadway system lane mileage had a surface score of 7 or
better, with an average score of 8 out 10. Rob Cherry asked if evaluation staff
was consistent from year to year. CME retains at least one staffer from the
<0189018c011e01c0015d017d01b50190000301c7011e0102018c0003019a017d000301750102015d0176019a0102015d017600030110017d01760190015d0190019a011e0176011001c7000301c1015d019a015a0003011e01c00102016f01b50102019a01
5d017d01760190035800030003L
D. 2017‐19 UPWP ‐ (Aaron) ‐
1) NYSDOT guidance and funding estimate ‐ guidance letter was
received from NYSDOT on 11/8; no change to federal planning
emphasis areas:
<019a018c010201760190015d019a015d017d01760003019a017d00030189011e018c0128017d018c0175010201760110011e0003010f01020190011e011a00030189016f010201760176015d017601500003037200030190019a015d016f016f0003010201
c10102015d019a015d017601500003L
federal rulemaking
models of regional cooperation ‐ largely addressed by
participation in NYSAMPO
ladders of opportunity (access to essential services) ‐
addressed by ongoing rural mobility analysis
Other emphasis areas include reduction of carryover balances and
documentation of local match ‐ two constraints on our program
are cost‐carrying capacity of host agency and ability to generate
in‐kind match.
Funding estimate: FAST ACT was supposed to provide additional
planning funds to MPOS, which it did, but NYSDOT has decided
to avail only 93% of those funds to MPOs to coincide with
obligation authority (we generally see OA used on the capital
side, but it is a new constraint on the planning fund side). As a
result, new incoming funds are slightly less ($8,700 in PL (2.7%)
but around 500 (1.2%) more in FTA) ‐ not problematic ‐ for the
purpose of preparing a two‐year program, we will project those
numbers out to the 2nd year at no increase.
2) Program solicitation results ‐ new project candidates project
solicitation was issued on 11/1 with a requested deadline of 12/12;
Project requests in order that they were received:
The Town of Lake George seeks assistance to identify a
bikeway extension from the existing terminus at Beach Road
northward through the Village, as well as identify any
<0176011e011e011a011e011a0003015d01750189018c017d01c0011e0175011e0176019a0190035500030102019a019a011e01750189019a0003019a017d0003018b01b501020176019a015d012801c7000301b5019001020150011e035500030102017601
1a0003L
arrive at a preferred alternative.
The Town of Johnsburg would like to explore potential non‐
motorized transportation improvements between
destinations in the Hamlet of North Creek, particularly to Ski
Bowl Park.
The City of Glens Falls would like to do some preliminary
planning for non‐motorized improvements along Murray
Street from Hudson Avenue to Pruyn's Island, possibly
considering a road‐diet / complete streets implementation.
Wayne LaMothe noted that this was a continuation of
earlier efforts dating back to the Exit 18 study. The recent
<003e0074005a00570003018c011e0189017d018c019a00030189018c011e01890102018c011e011a0003010f01c70003001c016f0102017600030057016f010201760176015d01760150000301020176011a00030018011e0190015d01500176000301c101
02019000030102016f0190017d0003L
noted as a support document.
<0064015a011e00030073015d016f016f01020150011e0003017d012800030027018c011e011e017601c1015d0110015a0003015d01900003015d0176019a011e018c011e0190019a011e011a0003015d01760003010200030190019a018c011e011e019a01
90011001020189015d017601500003L
project that would include modifications to surface parking,
<01020176011a00030102018c011e0003016f017d017d016c015d0176015000030128017d018c00030102000301890102018c016c015d017601500003010201760102016f01c70190015d01900003019a017d0003015a011e016f01890003015d0176012801
7d018c01750003019a015a0102019a0003L
conceptual design.
The Town of Queensbury seeks planning assistance to
develop a conceptual design for a bikeway connection
between a Halfway Brook Trail and the Hudson Pointe
development. The establishment of a north‐south bicycle
facility west of I‐87 is a long‐standing Town and MPO priority
Saratoga County is interested in pursuing conversion of an
abandoned rail line in Moreau and SGF into a rail‐trail. IDA
currently owns the right‐of‐way.
Jeff Tennyson suggested a parking study for the Lake George
Village Area as a possible candidate. Dan Barusch added that the
Town of Lake George was working on expanding parking options
and that a parking study was the Town's second UPWP priority.
<0074010201c70176011e0003003e01020044017d019a015a011e0003019001b501500150011e0190019a011e011a0003019a015a0102019a00030190011e0110017d0176011a00030189018c017d0169011e0110019a00030190017d016f015d0110015d01
9a0102019a015d017d01760003010f011e0003L
conducted after the first year of the two‐year program to help
prioritize that second year. Aaron noted that that could be done
<01020190000301890102018c019a0003017d01280003019a015a011e0003018c011e018b01b5015d018c011e011a00030102011a0175015d0176015d0190019a018c0102019a015d01c0011e000301b50189011a0102019a011e035800030064015a011e00
030110017d01750175015d019a019a011e011e0003L
agreed with the suggestion.
6. TIP
A. 2016‐21 TIP
1) Project updates from local sponsors (developments on active projects
since last meeting)
Warren County ‐ (Ed Doughney) ‐
o Public information meeting on Palisades Road Bridge to be
held in January; may be controversial due to ROW and
encroachments; design approval sought by late January.
o <0012005a000303f003f0000301020176011a000303ed03ef036c03ef03ed0003010f018c015d011a0150011e000301890102015d0176019a015d0176015000030189018c017d0169011e0110019a01900003015d0176000300440102018c0110015a000301
7d018c000300040189018c015d016f0003L
o Bridge painting / asbestos removal project ‐ state / local
agreement in by end of December.
o West Mountain Road pavement preservation project
<010201c10102018c011a011e011a0003019a017d00030057011e0110016c015a01020175035500030110017d01760190019a018c01b50110019a015d017d01760003015d0176000301900189018c015d01760150000303ee03ec03ed03f303550003001200
2f0003010f01b50003L
consultant.
o Bay Road pavement preservation project ‐ design approval
due this month, PS&E in January, letting in Feb / March.
Washington County ‐ no report
City of Glens Falls ‐ (Ed Bartholomew) ‐ Fire Road TAP project will
be out for bid in March and completed during CY 2017
Pavement preservation ‐ Karen Hulihan noted that considerable
time has elapsed since the Town of Moreau has been in touch
with NYSDOT. Delivery schedule has been adjusted. Aaron offered
to facilitate a meeting.
2) NYSDOT report ‐ Rob Cherry noted that Region 1 and the municipalities
within are continue to be at or near the top Regions in the state in terms
of local project delivery. Scott Sopczyk requested coordination with GGFT
with regard to the NYS 9N repair project to identify potential service
adjustments.
3) Transportation Alternatives Program (Rob Cherry) ‐ Applications were
due in November; review and ranking was conducted, results sent to
Main Office; no timetable for announcement.
7. Other Items of Interest ‐ <003c0102019a011e00030176017d019a011e011a0003019a015a011e0003017d01760150017d015d01760150000301c1017d018c016c0003010f01c700030073002c00110003017d01760003019a015a011e0003005e019a018c0102019a011e0150015d01
100003L
Highway Safety Plan. Wayne LaMothe reported on the first meeting of the study to
analyze the potential benefits of establishing commuter rail service between North
Creek and Rensselaer Station, and that some resistance was evident for the larger rail
operators to consider service changes. Mike Valentine provided a reminder of the
upcoming Saratoga County Planning and Zoning Conference to be held on January 25,
2016 at the Saratoga Springs City Center,
8. Next Meeting and Adjourn ‐ Next meeting for January 18 at 10:00 AM.
A motion was made to adjourn the meeting at 11:50.
Moved by: Wayne LaMothe: Seconded by: Scott Sopczyk
Meeting adjourned.
A/GFTC Planning Committee Minutes – Wednesday, October 19, 2016
A/GFTC TAC Minutes DRAFT
Wednesday, October 19, 2016 10:00 AM
Crandall Public Library, Glens Falls
Attendees Representing
Stu Baker Town of Queensbury Community Development
Ed Bartholomew EDC of Warren County
Frank Bonafide NYSDOT Region 1
Rob Cherry NYSDOT Region 1
Steve Godlewski Creighton Manning Engineering
Steve Haskins Washington County DPW
Maiken Holmes Warren County DPW
Karen Hulihan NYSDOT Region 1
Tom Johnson The Chazen Companies
Wayne LaMothe Warren County Planning
Laura Oswald Washington County Economic Development
Dan Rourke Barton and Loguidice
Mike Valentine Saratoga County Planning
Greg Wichser NYSDOT Region 1
Staff
Aaron Frankenfeld A/GFTC
Kate Mance A/GFTC
1. Welcome and Introductions
2. Visitors Issues ‐ none
3. Transit
A. GGFT Update ‐ no report
B. Rural mobility analysis ‐ (Kate):
contract offered to team led by Steadman Hill Consulting
data provided by staff to consultant includes base GIS layers, contact
list, existing data
preliminary stakeholder list identified, CME making contacts to
conduct surveying
the first advisory committee meeting will be scheduled for a date
about one month from now in order to provide time for the
<0110017d0176019001b5016f019a01020176019a0003019a011e010201750003019a017d00030189018c017d01c0015d011a011e0003015d0176015d019a015d0102016f0003010201900190011e019001900175011e0176019a0003017d01280003011a01
02019a01020003L
4. UPWP
A. Aviation Road ‐ QUFSD access study ‐ (Aaron):
draft interim report approved with minor comments
Adirondack / Glens Falls Transportation Council
11 South Street, Suite 203
Glens Falls, NY 12801
p: (518) 223 – 0086 f: (518) 223 – 0584
info@a
gftc.org www.agftc.org
<0110017d0176019a018c0102018c01c70003019a017d000301c1015a0102019a000301c10102019000030190019a0102019a011e011a00030102019a0003019a015a011e0003016f01020190019a00030175011e011e019a015d0176015003550003011001
7d0176019001b5016f019a01020176019a0003015a01020190L
informed A/GFTC that some cost increases due to scope change could
be expected
meeting was held on 9/21 to review alternatives; credit to B&L for
developing creative alternatives; some of which were eliminated by
Town and School officials
follow up meeting was held yesterday to review new alternatives
based upon feedback at first meeting, including:
installation of WB RTL into campus along with upgraded signal
<0176011e01c100030190015d015001760102016f015d01cc011e011a0003015d0176019a011e018c0190011e0110019a015d017d017600030102019a00030012017d019a019a01020150011e0003002c015d016f016f0003005a017d0102011a0003036c00
030176011e01c1000301900110015a017d017d016f0003L
access
combination of those concepts
draft report to carry recommendation of upgrades to existing access
as well as new signalized access for high school
<010201890189018c017d01c00102016f00030190011e018b01b5011e01760110011e000301c1017d01b5016f011a0003015a010201c0011e0003019a015a015d019000030110017d01750175015d019a019a011e011e00030110017d01760190015d011a01
1e018c015d017601500003011a018c01020128019a0003L
report for public comment at next meeting
B. Traffic Count Program ‐ (Kate):
Significant work done on GIS layer created to identify and affirm
priority count locations
Not enough known at this time to develop RFP
Eventually will seek input from County DPWs on refined locations,
and hope to have Counties provide GPS data for locations (potential
source of local match)
Mike Valentine asked if Tom Speziale would be contacted. Aaron and
Kate replied that the services would indeed be offered to Saratoga
County, despite appearing to have had success in maintaining its own
count program. Rob Cherry asked about potential QA/QC responsibility
for consistency with State standards for data collection and reporting.
Kate stated that that was unknown at this point, given that NYS had not
yet arrived on a preferred reporting platform for future use. Frank
Bonafide suggested that count location selection consider crash data in
order to properly analyze safety issues.
C. Update on other UPWP tasks ‐(Aaron): Review of status of programmed
projects:
<006401c1017d000301c7011e0102018c0003011001c70110016f011e00030128017d018c0003010f018c015d011a0150011e00030189018c011e0190011e018c01c00102019a015d017d01760003018c011e01c0015d011e01c10003019001b50150015001
1e0190019a011e011a035500030190016c015d01890189015dLng this
year
Route 9 study ‐ on hold to avoid conflation with EDC effort, possibly
build from conclusions / data collection
<0064018c010201280128015d011000030190015d015001760102016f0003017d0189019a015d0175015d01cc0102019a015d017d0176000303720003017d01760003015a017d016f011a035500030190019a01020128012800030189018c015d017d018c01
5d019a01c703550003010f01b5019a00030110017d01760110Lerned
about implementation
Climate Change Adaptation Planning ‐ White Creek watershed study
complete
<0012010201760102016f01c1010201c70003019a018c0102015d016f00030110017d01760176011e0110019a015d017d0176000303720003003c015d017601500190010f01b5018c01c70003036c00030026017d018c019a0003001c011a01c10102018c01
1a0003037200030102019a0003019a015a011e0003L
suggestion of Kingsbury supervisor, on‐hold pending resolution of
dewatering facility access road issue
ITS architecture ‐ on‐hold; no need yet articulated
<0057011e018c0128017d018c0175010201760110011e000303720003010f01020190011e011a00030189016f010201760176015d017601500003019a018c010201760190015d019a015d017d017600030190019a018c0102019a011e015001c70003037200
03010201c10102015d019a015d0176015000030190019a015dLll
incomplete rulemaking (possibly November 16 for bridges and
pavement)
Travel demand modeling and GIS efforts linked to performance‐based
planning recommendations
Annual pavement scoring has been initiated by CME
Can likely advance website upgrade, Environmental Justice review
update
D. 2017‐18 UPWP solicitation ‐ (Aaron):
16‐17 program solicitation was distributed last week for your review
looking for comments as to possible inclusion or deletions, and to
start the discussion about any potential program requests that we
can expect to receive
Status of projects listed previously suggest considerable program
carryover of incomplete tasks into next year
MPOs can produce a two‐year program; past experience suggest a
comparable administrative load associated with 1‐ or 2‐year program
2‐year program may provide some flexibility to municipalities that
have longer‐term concepts
Wayne LaMothe suggested that this may be an opportunity to retry the
2‐year approach. The committee concurred. No changes were suggested
to the solicitation. Staff will therefore issue a two‐year call for projects.
5. TIP
A. 2016‐21 TIP
1) Project updates from sponsors (developments since last meeting)
Warren County (Maiken Holmes):
o Blair Road bridge project is being closed out
o <00570102016f015d01900102011a011e01900003005a017d0102011a0003010f018c015d011a0150011e000303720003011a011e0190015d015001760003010201890189018c017d01c00102016f0003011e01c60189011e0110019a011e011a0003015d01
760003L
December
o West Brook sidewalks ‐ project letting in December,
construction in spring 2017
o CR 44 bridge painting ‐ bid opening 10/19
o Bridge painting and asbestos removal project ‐ bids were
opened in August, construction in spring 2017
o West Mountain Road pavement preservation ‐ bid opening
10/20, construction in spring 2017
o Bay Road pavement preservation ‐ DAD finalized, letting in
spring 2017
Washington County (Steve Haskins): no significant developments
since last meeting. In response to a question from Frank Bonafide,
no recent correspondence from VTrans has been received
regarding CR 10 over the Poultney.
City of Glens Falls (Ed Bartholomew): public workshop recently
held for Fire Road; project would likely be progressed from north
to south
NYSDOT: Karen Hulihan distributed the regional TIP performance
<01b50189011a0102019a011e035600030176017d0003016f010201500150015d0176015000030189018c017d0169011e0110019a0190000301c1011e018c011e0003015d0176011a015d01100102019a011e011a03580003002f01760003018c011e019001
89017d01760190011e0003019a017d000301020003L
question from Wayne LaMothe, the Lake George Gateway Project
is largely complete and will be wrapped up in spring 2017.
Discussion ensued regarding project delays resulting from tribal
reviews.
2) Amendments and Modifications
i. Wright's Ferry Rail Crossing ‐ Putnam ‐ Frank Bonafide
provided background on the request and explained that it was
for a new project, not a schedule change. In response to a
<018b01b5011e0190019a015d017d017600030128018c017d017500030074010201c70176011e0003003e01020044017d019a015a011e0355000300040102018c017d01760003011e01c60189016f0102015d0176011e011a0003019a015a0102019a000301
0200030176011e01c10003L
project, by rule, requires public comment and Policy
Committee approval.
A motion was made to approve the requested TIP amendment for public review
and comment prior to Policy Committee consideration.
Moved by: Wayne LaMothe: Seconded by: Stu Baker Motion carried.
3) 5310 FTA ‐ Projects previously approved by A/GFTC committees have
been added to the TIP; no further A/GFTC staff activity is required.
4) eSTIP ‐ Aaron noted that it appears as though the new STIP has not been
made available for editing on eSTIP. Frank Bonafide reported that the
new STIP is not yet approved by FHWA.
5) Transportation Alternatives Program ‐ Kate reported on potential project
sponsors and other interested parties that have contacted staff. Frank
Bonafide stated that there had been some glitches with the online
project application process and encouraged potential applicants to not
wait until the deadline to submit projects.
6) Bridge NY ‐ nothing yet to report on the statewide solicitation.
6. Other Items ‐ Wayne LaMothe reported that AMTRAK was now considered as a non‐
participant in the IBI rail service analysis due to an apparent need for a non‐disclosure
agreement that will not be signed by Warren County; as a result, the project is being
held up
7. Next Meeting and Adjourn
The next meeting scheduled for December 14
A motion was made to adjourn the meeting at 11:22.
Moved by: Wayne LaMothe: Seconded by: Laura Oswald
Meeting adjourned.